VPP optimisation must stay within the technical boundaries of each asset, site, and grid connection. Define the control contract before market activation so that every command has an unambiguous meaning and a safe fallback.
Local protection settings, device limits, and grid-connection constraints remain leading. A VPP command must never override equipment protection or an agreed site limit.
Warning
Warning
Define and test fallback behaviour before enabling external dispatch. A lost, delayed, or invalid signal must result in a known safe state.